Completion Date at Year 2010
| Office Facilities Renovation Works at Leighton Centre Causeway Bay HK | |||
| Client/Consultant/Main Contractor | Leighton Property Co Ltd / JLL / Tactful | ||
| Nature Involved | Commercial Premises | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Nov-2010(WIP) | Contract Sum | HK$17M |
| SMC Renovation Works on Level 6 at HSBC Main Building | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2010(WIP) | Contract Sum | HK$3.2M |
| Fitting Out (Main Contract) of HSBC Branch at Shop 309-310 Dragon Centre 37K Yen Chow Street Sham Shui Po | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jun-2010(WIP) | Contract Sum | HK$4.2M |
| Workplace Management Project for HSS Global Custody and Fund Services Multi-Fond at L6 T1 HSBC Centre | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jun-2010(WIP) | Contract Sum | HK$0.3M |
| AMH TSC Reorganization at 5/F HSBC Bldg 673 Nathan Road Mong Kok | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | May-2010 | Contract Sum | HK$0.6M |
| Builder's Work for Full Refurbishment of HSBC Branch at 54-62 Kwong Fuk Road Tai Po | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | May-2010 | Contract Sum | HK$4.5M |
| HSBC Granite Cladding Works at Tai Po Kwong Fuk Road in Tai Po | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Feb-2010 | Contract Sum | HK$0.6M |
| HSBC Project Gears for Electric Road Branch | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jan-2010 | Contract Sum | HK$0.27M |
Completion Date at Year 2009
| Supply and Installation of Community Caring Kiosk for 20 HSBC Branches | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Improvement Work | ||
| Completion Date | Dec-2009 | Contract Sum | HK$0.73M |
| Fitting out to Cobam Office at L22 Henley Building Central | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2009 | Contract Sum | HK$0.79M |
| Storage Reinstatement and Office Fitting-out Work (Builder's Work) for Unit 301A & 302A at Hutchison Logistic Centre Kwai Chung | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2009 | Contract Sum | HK$0.75M |
| Builder's Work for Alteration of HSBC International Bank at L6 HSBC Main Bldg 1 Queen's Road Central | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2009 | Contract Sum | HK$0.11M |
| HSBC HMB L13 Private Bank - Meeting Suites Renovation | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2009 | Contract Sum | HK$3.0M |
| Upgrading of Security System & Renovation of Lobbies for Block A to F of Lok Man Sun Chuen (Phase II) | |||
| Client/Consultant/Main Contractor | Hong Kong Housing Society / Tactful | ||
| Nature Involved | Residentials | ||
| Work Categories | Improvement, Fitting Out & Renovation | ||
| Completion Date | May-2009 | Contract Sum | HK$13M |
| Fitting Out for HSBC Express Banking at 256 Hennessy Road Wanchai HK | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Mar-2009 | Contract Sum | HK$0.33M |
| Repair and Renovation to 6/F Mezzainine Floor at Cayman Rise (B/074/08) | |||
| Client/Consultant/Main Contractor | Hong Kong Housing Society / Tactful | ||
| Nature Involved | Residentials | ||
| Work Categories | Improvement, Fitting Out & Renovation | ||
| Completion Date | Jan-2009 | Contract Sum | HK$0.83M |
Completion Date at Year 2008
| Extension of HSBC Branch at Sing Woo Road Happy Valley | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2008 | Contract Sum | HK$7.6M |
| Renovation Works at 2/F&3/F HSBC TST Bldg at 82-84 Nathan Road Tsimshatsui | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Nov-2008 | Contract Sum | HK$4.6M |
| Renovation of HSBC Express Banking at Fu Shin Shopping Centre | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2008 | Contract Sum | HK$0.25M |
| Fitting-Out for Workpalce Management Project for HSBC Private Bank (Suisse) Sa at Suites 1301-1304, 1311-1314 and Park of Suites 1305 13/F Cityplaza IV 12 Taikoo Wan Road Taikoo Shing Island East HK | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2008 | Contract Sum | HK$2.20M |
| Fitting-out for HSBC HTS Global Banking and Markets at 17/F Cityplaza I Taikoo Shing | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2008 | Contract Sum | HK$0.92M |
| Fitting-Out Work at Shop 1225-1245 on 1/F Tuen Mun Town Plaza Phase I | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2008 | Contract Sum | HK$2.76M |
| Renovation Works at G/F & 1/F Peninsula Centre 67 Mody Road TST | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2008 | Contract Sum | HK$3.88M |
| Fitting-Out Work of HSBC Global Markets Operations at 22/F Cityplaza I Taikoo Shing (Phase I) | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2008 | Contract Sum | HK$1.9M |
| Builder's Work for Minor Alteration for Airport Branch | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jul-2008 | Contract Sum | HK$0.11M |
| Additional of Logo Signage at Shopping Arcade of Kai Tak Garden | |||
| Client/Consultant/Main Contractor | Hong Kong Housing Society / Tactful | ||
| Nature Involved | Shopping Arcade | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | May-2008 | Contract Sum | HK$0.28M |
| HSBC HTS Global Banking & Market at 13/F Cityplaza I Taikoo Shing | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | May-2008 | Contract Sum | HK$2.25M |
| HSBC Sheung Shui SME Centre | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Apr-2008 | Contract Sum | HK$0.53M |
| HSBC New CPC Back-Up Site and Contingency Site at L8 T3 HSBC Centre | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Mar-2008 | Contract Sum | HK$0.22M |
| HSBC HR & Insurance Offices at L2 & L5 HSBC Centre 1 Sham Mong Road Kln | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Mar-2008 | Contract Sum | HK$2.4M |
| HSBC Metro Centre CTC in Kowloon Bay | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Feb-2008 | Contract Sum | HK$1.8M |
Completion Date at Year 2007
| QNR Sales Office at 1 Wo Fung Street Ko Shing Street Sheung Wan | |||
| Client/Consultant/Main Contractor | Pacific Century Premium Developments | ||
| Nature Involved | Sales Office and Residential Apartment Mock-up | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2007 | Contract Sum | HK$1.4M |
| HSBC SME Centre at Ocean Centre Tsimshatsui | |||
| Client/Consultant/Main Contractor | HSBC/ EC Harris/ Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2007 | Contract Sum | HK$0.49M |
| Hong Kong Family Welfare Society West Kln Centre Shamshuipo (West) Integrated Family Service Centre at Lai Kok Estate | |||
| Client/Consultant/Main Contractor | HK Family Welfare Society/ Brighspect/ Tactful | ||
| Nature Involved | Family Service Centre | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Nov-2007 | Contract Sum | HK$1.3M |
| Design and Construction of Fitting-out Works to Building and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible in the Designated Contract Area: New Territories Eastern Region (Contract No. TC-N017) | |||
| Client/Consultant/Main Contractor | HKSAR / Architectural Services Department (ASD) / Union | ||
| Nature Involved | Community Amenities, Municipals, Offices, Schools, Hospitals, Residentials (Term Contract) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2007 | Contract Sum | HK$130M |
| Green Gardens at the Rooftops at HSBC Building at 673 Nathan Road Mongkok | |||
| Client/Consultant/Main Contractor | HSBC/ EC Harris/ Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2007 | Contract Sum | HK$0.16M |
| HSBC Kung Yip Street Branch Reinstatement | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2007 | Contract Sum | HK$0.53M |
| HSBC Shatin SME Ctr at Room 620 6/F Citylink Plaza Shatin | |||
| Client/Consultant/Main Contractor | HSBC / EC Harris / Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jun-2007 | Contract Sum | HK$0.28M |
| Modification of Combining Room into One Suite Le Meridien Cyberport | |||
| Client/Consultant/Main Contractor | Hong Kong Cyberport Mgtt Co Ltd | ||
| Nature Involved | Hotel | ||
| Work Categories | Modification & Renovation | ||
| Completion Date | Apr-2007 | Contract Sum | HK$0.36M |
Completion Date at Year 2006
| InterContinental Hong Kong - Nobu Restaurant Fit-Out | |||
| Client/Consultant/Main Contractor | Inter-Continental Hong Kong/Tactful | ||
| Nature Involved | Restaurant (480m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2006 | Contract Sum | HK$12.72M |
| Upgrading Works to 6-8 Ching Sau Lane, Chung Hom Kok | |||
| Client/Consultant/Main Contractor | Incorporated Owners of Ching Sau Lane/Ermic Yim Design/Tactful | ||
| Nature Involved | Low Rise | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jun-2006 | Contract Sum | HK$3.4M |
| 50/F & 51/F Lift Lobby, Fireman Lift Lobby and Corridor Interior Fitting Out Works Contract, TWTL407, 116-122 Yeung Uk Road | |||
| Client/Consultant/Main Contractor | Global Cheer/Ma Leung Assoc./Tactful | ||
| Nature Involved | Services Apartment | ||
| Work Categories | Fitting Out | ||
| Completion Date | Jun-2006 | Contract Sum | HK$1.6M |
Completion Date at Year 2005
| Exterior Hard Landscape Works to Show House No.27 and No.93, Lot 1184 in DD217, Man Kei Toi, Pak Sha Wan, Sai Kung | |||
| Client/Consultant/Main Contractor | Mancas Investment Ltd/AB Concept Ltd/Tactful | ||
| Nature Involved | Residential (220m2) | ||
| Work Categories | External Landscape Works | ||
| Completion Date | Nov-2005 | Contract Sum | HK$1.5M |
| Inter-continental Hong Kong Steakhouse Refurbishment | |||
| Client/Consultant/Main Contractor | Inter-Continental Hong Kong/Tactful | ||
| Nature Involved | Restaurant (480m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2005 | Contract Sum | HK$4.36M |
| Renovation and Fire Safety Direction of HSBC Building at Tsim Sha Tsui, Hong Kong | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2005 | Contract Sum | HK$5.57M |
| Builder's Works for Fitting Out of HSBC HTV Restack at 4/F, 11/F, 13/F and 14/F HSBC Building Mongkok | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Aug-2005 | Contract Sum | HK$3.82M |
| Fitting Out to Office and New Stage Over Pond for Cyberport 4 (M3310) | |||
| Client/Consultant/Main Contractor | Cyber-Port Ltd/Tactful | ||
| Nature Involved | Office & Podium (5,820m2) | ||
| Work Categories | Fitting Out & External Works | ||
| Completion Date | May-2005 | Contract Sum | HK$2.6M |
| Extension and Refurbishment of HSBC Telford Gardens FSB, HPC & FMC | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (600m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Jan-2005 | Contract Sum | HK$2.5M |
Completion Date at Year 2004
| Cyberport Development at Telegraph Bay Quotation for Ceiling Painting Works at Cyberport 3 (M371) | |||
| Client/Consultant/Main Contractor | PCCW/Tactful | ||
| Nature Involved | Office | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2004 | Contract Sum | HK$1.8M |
| Fitting Out Works to Clubhouse in Main Contract R1 for Phase R1a and R1b for Cyberport Residential Development at Telegraph Bay (R151) | |||
| Client/Consultant/Main Contractor | PCCW/Tactful | ||
| Nature Involved | Deluxe Clubhouse (8,000m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2004 | Contract Sum | HK$37.0M |
| Toilets Upgrade Project at Tech Centre, 72 Tat Chee Avenue, Kowloon Tong, Kowloon | |||
| Client/Consultant/Main Contractor | Design Othering/Tactful | ||
| Nature Involved | Office (440m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Nov-2004 | Contract Sum | HK$4.5M |
Completion Date at Year 2003
| Cyberport Development at Telegraph Bay Quotation for Fitting-out Works to Wireless Solution Development Centre on Level 4, IT Street at Cyberport C1B Office (M370) | |||
| Client/Consultant/Main Contractor | PCCW/Tactful | ||
| Nature Involved | Shop (200m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Nov-2003 | Contract Sum | HK$1.2M |
| Hotel Inter-Continental/Adeas LPT Ltd./Tactful | |||
| Client/Consultant/Main Contractor | Hotel Inter-Continental/Adeas LPT Ltd./Tactful | ||
| Nature Involved | Hotel | ||
| Work Categories | Signage & Renovation | ||
| Completion Date | Oct-2003 | Contract Sum | HK$4.1M |
| Fit out and Renovation Works for 17/F and M/F AIA Plaza 18 Hysan Avenue Causeway Bay Hong Kong | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (400m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2003 | Contract Sum | HK$1.4M |
| Builder's Works for Extension Work to Discovery Bay Branch at Shop G13 & G15A, DB Plaza Discovery Bay, Lantau Island Hong Kong | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (50m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Mar-2003 | Contract Sum | HK$0.9M |
| Fit Out Works for HSBC D&N / Premier Branch at G/F, 1/F & 2/F Onward Building, Nathan Road, Kowloon | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (180m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Mar-2003 | Contract Sum | HK$1.9M |
| Builder¡¦s Works for Extension Work to Discovery Bay Branch at Shop G13 & G15A, DB Plaza Discovery Bay, Lantau Island | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (100m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Mar-2003 | Contract Sum | HK$0.9M |
Completion Date at Year 2002
| Office Alteration for APH Training at 13/F, Mongkok Building, 673 Nathan Road, Kowloon | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Office (800m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Dec-2002 | Contract Sum | HK$1.0M |
| Conversion of Kowloon Hotel Branch to Premier Centre at the Kowloon Hotel, 19-21 Nathan Road, Kowloon | |||
| Client/Consultant/Main Contractor | HSBC/EC Harris/Tactful | ||
| Nature Involved | Bank (1,200m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Dec-2002 | Contract Sum | HK$3.2M |
| Hong Kong Bank Branch at Harbour City | |||
| Client/Consultant/Main Contractor | HSBC/Citex/Tactful | ||
| Nature Involved | Bank (1,300m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Jun-2002 | Contract Sum | HK$2.1M |
Completion Date at Year 2001
| Phase II, HSBC Building, 637 Nathan Road, Mongkok | |||
| Client/Consultant/Main Contractor | HSBC/HSBC Property (Asia) Ltd./Tactful | ||
| Nature Involved | Office (3,100m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2001 | Contract Sum | HK$4.7M |
| Hong Kong Bank Branch at Aberdeen Centre | |||
| Client/Consultant/Main Contractor | HSBC/Citex/Tactful | ||
| Nature Involved | Bank (300m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Sep-2001 | Contract Sum | HK$1.8M |
Completion Date at Year 2000
| Phase II, HSBC Building, 637 Nathan Road, Mongkok | |||
| Client/Consultant/Main Contractor | HSBC/HSBC Property (Asia) Ltd./Tactful | ||
| Nature Involved | Restaurant, Office (3,100m2) | ||
| Work Categories | Fitting Out & Renovation | ||
| Completion Date | Oct-2000 | Contract Sum | HK$6.2M |
| Fit out of Tower 1 HSBC Centre, Shum Mong Road | |||
| Client/Consultant/Main Contractor | HSBC/HSBC Property (Asia) Ltd./Tactful | ||
| Nature Involved | Office (23,400m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Jun-2000 | Contract Sum | HK$13.4M |
| Pok Hong Shopping Centre (Contract No. 103 of 1998) | |||
| Client/Consultant/Main Contractor | Hong Kong Housing Authority/Hope Lee | ||
| Nature Involved | Shopping Centre (3,500m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Feb-2000 | Contract Sum | HK$13.8M |
| Hong Kong Bank Branch at Sheung Shui | |||
| Client/Consultant/Main Contractor | HSBC/HSBC Property (Asia) Ltd./Tactful | ||
| Nature Involved | Bank (100m2) | ||
| Work Categories | Fitting Out | ||
| Completion Date | Jan-2000 | Contract Sum | HK$1.1M |